Bastrop Jackson


The Bastrop Jackson Abandoned Mine Land (AML) Reclamation Project was Mitigation Resources’ first reclamation services project for the Railroad Commission of Texas. The Bastrop Jackson site consisted of Priority I subsidence features of varying degrees of danger. The site was experiencing subsidence on two residential properties. Utilizing our in-house construction team and equipment, Mitigation Resources backfilled subsidence features with excavated topsoil stockpiles and designed, constructed, and surveyed a channel to allow surface water drainage, and revegetated the backfilled areas.

Contact Information

Eric Slusser, P.E., Program Manager
662.387.7139
eric.slusser@mitigate.pro
Status

Completed

State

Texas

Solution Type

Abandoned Mine Land Reclamation